Opole Power Plant | Opole, Poland
Design & Construction of (2) Natural Draft 185m Cooling Towers
Two 185 meter natural draft cooling towers were designed and constructed at the Opole Power Plant in Opole, Poland. The towers were constructed via the jumpform method, and utilized cooling technology from GEA/ENEXIO.